Facilities
Our facilities were designed and built to manufacture and repair cylinders a few of the many features.
- 84,000 square foot plant in Bay Springs, Mississippi
- CAD Engineering systems
- Warehouse stocks 400,000 lbs of raw material
- 4 saws capable of cutting 20” OD
- Flame burning to 8” thick
- 16 5-ton overhead cranes
- 3 10-ton overhead cranes
- 14 engine lathes up to 59” swing up to 48’ centers
- 9 turret lathes up to 40” swing
- 8 milling machines
- 3 boring mills
- 8 drilling machines
- CNC lathe/milling facility
- 5 CNC turret lathes up to 32” swing
- 2 large CNC machining centers
- 2 honing machines capable of 20” bores and 27’ length
- 12 wire welding machines – all welding done on site, TIG, MIG and SUB arc
- 4 test stands – hydraulic or water glycol
- Hydraulic test stand capable of 10,000 psi
- On site gauge calibrating equipment
- On site sandblasting and painting facility
- On site MAG particle inspection
- 9 lift trucks up to 40,000# capacity
- 1 grinding, polishing machine 18" OD, 30' long



